2-4 weeks before moving

Connect internet and broadband

Book your internet connection now — activation timing depends on your connection type and address, so it's worth checking early.

Get my personalised moving timeline
Hand holding a set of house keys in front of an open door

Internet connection timelines are one of the most commonly underestimated parts of a move — some connection types take one to two weeks, not one to two days.

How to do it

  1. Check what connection types are available at your new address before choosing a plan — fibre availability varies street to street, and an older or rural property may have fewer options than you'd expect.
  2. Book 2+ weeks ahead if you can, especially for a new fibre install, which sometimes needs a technician visit — booking during moving week itself is the most common reason people end up without internet for their first days in a new home.
  3. Compare providers — the same underlying network (e.g. fibre) is sold by many retailers at different prices and with different perks, so the connection type doesn't lock you into any one company.
  4. Ask about a mobile hotspot option as a stop-gap if your connection date will land after move-in — most providers or your own mobile plan can cover a short gap without leaving you offline entirely.
  5. Confirm what equipment you need to return, if anything — most NZ routers are yours to keep, but check with your outgoing provider if you're on an older plan or unsure.

Common mistakes

  • Assuming your existing provider will "just work" at the new address without a new order.
  • Leaving it until moving week, when installation slots are much harder to get.
  • Not checking early termination fees on your current plan before switching.

Related tasks

Sort your power connection at the same time — some providers offer a discount for bundling both.

Useful links

What goes wrong

Example scenario

A new install booked in moving week

What can go wrong
You order broadband in moving week, and the address needs a new fibre install with a technician visit.
The impact
Some connections take one to two weeks, so you may be without home internet for that long.
How to avoid it
Check what’s available at the address, then book two or more weeks ahead. If the connection will land after you move in, line up a mobile hotspot to cover the gap.

Official guidance

Frequently asked questions

How long does it take to connect broadband at a new address?
If the connection type already exists at the address (fibre, VDSL or ADSL), typically 5-7 working days — or as little as 2 working days for fibre if an ONT is already installed. If fibre isn't installed at all yet, budget 4-8 weeks for a new install, genuinely longer than most people expect.
How much notice should I give my provider before moving?
At least two weeks, per most major providers' own guidance — enough buffer to confirm the new connection is actually live before you cancel the old one, rather than risking a gap with no internet at all.